Skip to content
UNCLASSIFIED·EXCALIBUR·MAVRC TELEMETRY + MAVRC AI
LAST SYNC 14:23Z
READINESS COMMAND · 07 · FORCE VIEW
LIVE · +4 TFOM FROM 14:28Z DEBRIEF

USS CV-CG-0042 · overall 87% ready.

PESTO rollup across Personnel · Equipment · Supply · Training · Ordnance. DRRS-N-compatible. Each red line links to a recommended training action that can be scheduled into tomorrow’s POD in a CFEMP-safe window.

PFOM
88%
Personnel
Manning 96% · 4 CFEMP amber
MFOM
82%
Equipment
SPY-1 degraded · CASREP 25-04
SFOM
91%
Supply
Within OFRP sustainment norms
TFOM
82%
Training
BMD CIC 82% · was 78% pre-debrief
OFOM
94%
Ordnance
Magazine fully populated
GAPS · 4 · EACH LINKS TO A POD ACTION
  • 2 FCs missing PQS 300 line tied to TACMEMO 3-01
    FC1 NGUYEN, FC2 PATEL · TACMEMO 3-01 ¶ 2.4
    ACTIONAssign 20-min CBT · insert into tomorrow POD · sleep-safe window
  • Recurring engagement-window skip across 4 of last 7 BMD events
    NLLP candidate · originates from today's AAR
    ACTIONSurface to PBFT for SOP review · Chief STGC queue
  • 3 sailors on chronic sleep debt (CFEMP >72 h under 7 h)
    OPNAVINST 3120.2A §3.6 · PFOM driver
    ACTIONPropose watch swap to D5/N3 · affects PFOM 88 → 92
  • SPY-1 CAS degrades live-BMD training opportunity
    CSMP job 25-04-112 · MFOM driver
    ACTIONRe-route to simulator; schedule PMS-time PQS sign-offs for FCs
OFRP PHASE TREND
MAINTENANCE
72
BASIC
81
INTEGRATED
86
SUSTAINMENT
87
NOW
87
CANDIDATE SOPS · PBFT REVIEW
  • Engagement-window skip · candidate SOP
    Detected 4 / 7 events · NLLP package drafted
  • External-ID request vocabulary drift
    Not yet quorum · watching
Ingest more sources